top of page

Mitchell River Crossing

Anchor 1

​

Mitchell River Crossing, Normanton QLD

​

The project involves the design and construction a new approach to the Mitchell River Crossing (a Poly Gabion structure), as well as design and construction of a buried cut-off wall (utilising Elcorock sand filled bags) & the restoration of a failed section of the crossing. The works are located on Dunbar-Koolatah Road, in Carpentaria Shire. The design had to be cognisant of the limited approved budget for the project, and ensure that the design outcomes would not exceed the project budget. The design also had to consider tight construction timelines, as the work has to be completed within a short construction window before the wet season.

​

​

​

​

​

​​

Mitchell River Crossing - NDRRA
Mitchell River Crossing2 - NDRRA
Dunbar to Kowanyama Rd - NDRRA

Dunbar to Kowanyama Road

Carpentaria Shire, QLD

​

ERSCON was engaged for the Design and Construction management of 17 concrete causeways.

​

Upgrading the causeway, the project aims to provide a safer and more reliable connection between Dunbar and Kowanyama, improving access to essential services, promoting trade and commerce, and enhancing the overall connectivity of the area.

Flinders River Crossing - NDRRA

Flinders River Crossing, Normanton to Burketown Road

Carpentaria Shire, QLD

​

Concept and detailed design of causeway flood immunity improvement at the Flinders River Crossing on the Normanton-Burketwown Road in Carpentaria Shire.

Compass-ISO-9001-Stacked-Icon-V1.png
Unknown_edited.jpg
Screenshot 2024-04-15 at 11.23.40 AM.png
ipwea-logo-png-transparent.png
Screenshot 2024-04-15 at 11.28_edited.jp

© ERSCON Consulting Engineers

bottom of page