top of page

Bynoe River Crossings, Normanton QLD

Anchor 1

​​​

ERSCON is engaged to deliver the concept design to QldRA/NDRRA and secure funding for the project which has been successful. We have prepared detailed design drawings and documentation, tender and construction documentation and are currently managing the construction and project management of the project. The project involves the upgrading of three existing concrete causeways along the Normanton – Burketown Road.

 

ERSCON's design of new concrete box culverts and causeway approaches improves flood immunity for these causeways, whilst minimising impact on existing flows and improving fish passage across the causeways via improved fish ladders. The fish passage was also incorporated into the design, through improved/upgraded fish passages structures, working to current standards.

​

The project is constrained in that our design must not impact existing flows and fish passage, as well as local soil conditions, and detailed structural analysis has been completed to ensure that flows in flood conditions do not adversely affect the new structures.

​​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​​​​​​​​​​​​​

Back to NDRRA / Local Government Projects

​

Bynoe River Crossing - NDRRA
Bynoe River Crossing - NDRRA
Bynoe River Crossing approaches - NDRRA
Compass-ISO-9001-Stacked-Icon-V1.png
Unknown_edited.jpg
Screenshot 2024-04-15 at 11.23.40 AM.png
ipwea-logo-png-transparent.png
Screenshot 2024-04-15 at 11.28_edited.jp

© ERSCON Consulting Engineers

bottom of page